The next evolution of design build.

Structural Engineering

Services

Our approach will keep up with aggressive schedules, mitigate risks, and get your project online—faster.

See The Difference

Accelerated Project Delivery™ (APD)

Bring your project to market up to 25 weeks earlier.

APD is a way to evolve how projects are delivered, making them faster, more efficient, and less costly.

APD Benefits

  • Accelerate Project Schedules by 14 to 25 weeks.
  • Lower Material Costs by as Much as 22%
  • Strategic Early Material Procurement
  • Track Design and Price Materials with Real-Time Data.
  • Minimized Risk with Schedule Certainty
  • Reduced RFIs and Project Administration
  • Focus on Strategic Tasks Rather than Administrative Hurdles.
The APD Advantage

Structural Design + Detailing in One Team

With Apex, your team will get a fully coordinated approach and critical path certainty to minimize risk across all structural components.

Stakeholders:

By consolidating structural design and detailing, APD removes uncertainty at handoffs and gives stakeholders greater confidence in scope, cost, and schedule commitments.

Contractors:

APD brings structural design and procurement closer to the contractor, allowing teams to respond to cost and schedule impacts earlier and make informed decisions that keep critical projects moving forward.

Let's talk about how APD can reduce your project timeline, by months, not weeks.

Discuss Your Project Opportunities

Talk With Apex

We produce deliverables that go straight into construction, helping teams move from design to building faster.

Faster ROI for Owner

We’ve delivered projects months faster than traditional methods, including side-by-side builds where our APD approach finished first.

Engineering a Better Solution

An out-of-the-box structural design helped our client win a competitive design-build pursuit—cutting structural steel by one-third.

Confidence Built on Better Information

APD delivers decision-ready structural information—helping stakeholders align, commit, and execute with confidence.

Designed for Today’s Labor Market

APD minimizes RFIs, streamlines submittals, and reduces meeting overload—so teams can focus on building, not project administration.

Mission Critical

Space Exploration

Ship Manufacturing

Common Client Questions

Where does the 14-25 week time savings come from?

APD saves 14–25 weeks by combining structural design and detailing under one contract and within one software environment. By overlapping design, procurement, and detailing, we eliminate many structural RFIs, reduce submittal review time, and cut down on endless coordination meetings—accelerating the path from design kickoff to steel erection.

Has APD been proven on real projects?

Yes. APD has been proven on complex, real-world projects including advanced manufacturing, advanced technology, space exploration, and mission-critical facilities. By delivering rolling structural information earlier, teams can secure long-lead procurement dates sooner—or pivot to alternate solutions—keeping the project on schedule.

Will APD work for my type of project?

APD is not necessary for every project. It is best suited for projects that are inherently complex and where schedule certainty and early procurement decisions are critical—such as advanced manufacturing, advanced technology, space exploration, ship manufacturing, and mission-critical facilities. If long-lead items or aggressive timelines drive risk, APD is typically a strong fit.

How does APD affect other trades and coordination on site?

APD supports other trades by providing more accurate structural information for coordination. Because the structure is modeled at a higher level of detail than a typical design model—including items like plates and kickers—other disciplines can coordinate hanger locations, duct routing, and pipe paths around real conditions earlier. This reduces field measuring, lowers project costs, and helps teams turn the building over sooner.

On prior projects, Apex has also modeled joist web members so subcontractors could coordinate digitally around panel points well before mobilizing on site. This allowed teams to prefabricate hangers, pipe runs, and other materials in advance, improving installation efficiency once construction began. In addition, Apex actively communicates critical structural schedules and can quickly pivot when MEP/FP or owner information evolves, helping keep the project moving without disrupting.

Contact Apex

Discuss Your Project Opportunities

For additional information or project-specific inquiries, please contact our team and we will get back to you promptly.

  • Should be Empty:
Facebook-f Linkedin-in X-twitter Instagram

Copyright 2026 Apex Structural Engineering. All rights reserved.