Accelerated Project Delivery™ (APD)

Accelerated Project Delivery™ (APD) provides schedule acceleration while controlling construction costs. Apex designs the structural steel and concrete while concurrently designing connections and preparing submittal drawings for all structural steel, stairs, miscellaneous steel and concrete/rebar deliverables. APD provides critical path certainty through a one stop submittal for all structural design and detailing scope items.

  • Accelerate Design & Detailing Schedules
  • Reduced RFIs & Contract Administration
  • Lower Material Costs & Carbon Footprint
  • Early Connected Models & Clash Detection
  • Streamlined Structural Coordination, Fewer On-Site Fixes

Accelerated Project Delivery™ Schedule

Traditional construction schedules are widely used but come with notable drawbacks that can hinder project efficiency and escalate costs. These rigid schedules often lack the flexibility needed to adapt to unforeseen conditions, from owner driven design changes to long lead times, leading to inefficient resource utilization, cost overruns, increased risk of errors, and construction schedule delays.

  • Rigidity: Difficulty in adapting to owner changes.
  • Cost Overruns: Extended durations and delays cause schedule and cost overruns.
  • Inefficient Resource Use: Leads to idle workers and equipment.
  • Risk of Errors: Fast-paced schedules may compromise construction quality.
  • Lower Worker Morale: Pressure and stress negatively affect productivity.

Traditional Project Schedule